Pandora opens first Vietnam factory, adding a manufacturing base beyond Thailand
Pandora has opened its first jewellery manufacturing site outside Thailand in Ho Chi Minh City. Its annual output, capacity gain and jobs figures remain future targets.

Pandora opened a US$150 million jewellery crafting facility in Ho Chi Minh City on 1 October. The company says the opening ceremony included the crafting of its first piece in Vietnam. That is a completed site-opening milestone; it does not show that the plant has reached its planned production rate.
The facility is in Vietnam-Singapore Industrial Park III and covers 7.5 hectares. It is Pandora's fourth manufacturing site globally, adding a Vietnamese base to the three factories it has operated in Thailand. The immediate change for readers tracking regional production is therefore geographic: the company now has a second country in its crafting footprint, rather than only an announced plan to build one.
Pandora describes the new site as designed to produce up to 60 million pieces a year and to raise its total manufacturing capacity by 50%. It says the facility will create 7,000 local jobs when fully operational. Those figures are capacity and employment targets for a ramped operation, not evidence of current annual output, staffing or a realised 50% increase.
What the second manufacturing base changes
Adding Vietnam gives Pandora a physical production option beyond Thailand, where it has built its jewellery-making expertise over decades. The company says the two countries' crafting teams will share knowledge through a training academy for Vietnamese craftspeople. That could help transfer skills as the site expands, but the announcement does not quantify how much work has moved between plants or establish a measurable reduction in supply-chain risk.
The company also expects the Vietnam facility to support future production of platinum-plated jewellery as it broadens its materials strategy. It says the building has achieved LEED Gold certification and that the operation will use renewable electricity and recycled silver and gold. Certification is a present building-status claim; the electricity and material-use statements describe the intended operating model and should be assessed against future operating evidence.
The distinction between opening and scale matters for suppliers, workforce partners and site assessors. A first piece made at a ceremony confirms that the process has begun, while sustained throughput requires trained staff, functioning equipment and a stable production ramp. The release does not provide current utilisation, an operating workforce count or a timetable for reaching the stated annual capacity.
The next useful updates will be actual staffing, sustained production volumes and the division of output between Vietnam and Thailand. Those figures would show how the new plant changes Pandora's manufacturing network in practice. For now, the verified operating milestone is the opened Vietnamese facility and its first crafted item; the large output and jobs numbers remain prospective.



