Google links US$160m water project to Malaysian campus
Gamuda will build shared facilities for Port Dickson and public supply, with ownership passing to a state body on completion.

Google is funding water infrastructure to serve its planned Port Dickson data-centre campus and public users in Negeri Sembilan, committing US$160 million to a shared reservoir and treatment plant.
The arrangement makes additional water infrastructure part of the campus investment. For Malaysia’s utilities and digital-infrastructure sector, the distinction is who pays for the assets and who ultimately owns them: Google provides funding, while a state body is to take ownership.
Working with the state government and water utility SAINS, Google has appointed Gamuda to build the facilities. Menteri Besar Negeri Sembilan (Incorporated), known as MBINS, will own them upon completion.
Google puts the treatment plant’s future capacity at 65 million litres of potable water daily. That is shared-system capacity, not a disclosed measure of campus consumption or the volume reserved for public users.
The off-river reservoir is designed to collect excess Linggi River flow and rainfall, retain supplies for lower-yield periods and help mitigate flooding. These are intended functions rather than measured operating results.
Google says its local assessment did not identify high scarcity or depletion risk. The project therefore should not be read as evidence of an existing water crisis. The announcement leaves the completion timetable and division of supply between the campus and public users unspecified.
Sources
- Google water infrastructure announcement, page dated 1 November 2026; release dateline 2 November 2026.



